Please wait ....



Syncronizing with fortnox

GUIDE TO CHANGE...

- GUIDE TO CHANGE OVERHEAT PROTECTION FUSE ON HIPSTER KOBRA / WALL / UC

ESTIMATED WORKING TIME 15 minutes.
TOOL NEEDED Allen key (Hex key) 2.5 mm..
TOOL NEEDED Plier
NOTE 1 Overheat fuses are connected directly to the mains. DO NOT WORK ON THE FUSES WHEN THE POWERCORD IS CONNECTED TO THE HIPSTER.
NOTE 2 All HIPSTER brewers have two overheat fuses, one on each block. Make sure correct fuse is exchanged.

BEFORE YOU START

Overheat fuses, is resettable. On top of the fuse there is a button. By pressing (quite hard) on the button it should be resetted to its standard state. Follow this guide ro reset the fuse.

STEP 1

IMPORTATNT ALWAYS REMOVE POWER BY UNPLUGGING THE POWER OUTLET BEFORE DOING ANY SERVICE ON ANY HIPSTER BREWER

STEP 2.

REMOVE THE WATER CONNECTION

STEP 3.

OPEN THE HEATCASE

STEP 4.

REMOVE OVERHEAT PROTECTION FUSE
Ensure you are removing correct fuse!

STEP 5.

INSERT OVERHEAT PROTECTION FUSE

STEP 6.

CLOSE THE HEATCASE
Dont forget to reinsert the insulation plate

STEP 7.

REATTACH WATER PIPES, TURN ON THE WATER

STEP 8.

RECONNECT THE POWER TO THE BREWER, TURN ON THE BREWER